Description
Description












Short production time
Mature production line, standardized process, CNC technology to ensure the accuracy of each production hole and size. 30 days ,your dream house will be completed
Easy and fast installation
In additional to the installation video and introduction, technical personnel can be arranged for on-site installation guidance .It be finished with 3 workers in 3 days, reducing the huge labor cost and ensure you move in the dream house as soon as possible.
Durability
Not every house can endure the long journey to another location when it is built outside the factory, then sub shipped to the customer's site, and then assembled into the house. Prefabricated houses require additional materials to reinforce their frames, so they are inherently more durable than traditional built houses, which are highly energy efficient through the use of smart home technology, high-performance thermal insulation and mechanical systems, and passive and active solar systems. They're also made of a variety of recycled and durable materials.
Various functions
It has a variety of interior and exterior decoration options. The materials selected are excellent in waterproof, corrosion
resistance and oxidation resistance, so the house is fully suitable for various places, locations and owners' needs
Smart accessories
Other modifiable items include air conditioning, heating, and smart features such as lighting, remote control
locks, and intelligent virtual assistants. These additional customization will also depend on the customer's budget.
Advantages of module house:
1. Won't require foundation and welding to build the house
2. Won't rust, color treatment is fluorocarbon, which can keep for more than 20 years. The service life of the house is over 50 years
3. All the parts are modular, easy to install and easy to replace
4. Glass is double layers insulation glass, same to the wall panels
5. The size can be customized
External
6000mm Length
2400mm Width
2400mm Height
Fireproof
material
|
Fire-proof Level : CEP Aluminum Insulation Panel
Fire Rating Fire Protection Time : 90 Minute |
|||
Sound
Insulation
|
House Decibels : 39-45 dB (The most suitable sound environment for human beings.)
|
|||
Ventilation
system
|
C24-M size module house :Positive and Negative Ventilation Fans
C40-L and C60-XL size module house: Fresh Air System Maintain air circulation inside the house. |
|||
Lighting
system
|
LED energy- saving ceiling small downlight
C24-M size module house : 4 lights C40-L size module house : 6 lights C60-XL size module house : 8 lights |
-
Power supplyWater supplyPower supply : The voltage is set based on the customer's country. Internal electric wires will be pre-installed, and add the international leakage switch.
Water supply : Set according to the customer's needs. Use PPR pipe. All the wires and pipes used will be hidden inside the walls
and will not be exposed.AirtightnessGrade 8WaterproofGrade 8Sound insulationGrade 10≤45DBWind resistanceGrade 11StackableNot approve.(Except for second opening area) - Warranty:1 YEAR
- Project Solution Capability: graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
Payment & Security
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.